During 2015 and 2016 year Jūrtransa Ltd. has arranged for permits and escorts, as well as partial delivery of more than 40 sets of wind turbine generators power plans to Mazeikiai and Silute district. The longest truck was 65 m length with the Rotorblades and heaviest were 113 tons with Nacelle.