TRANSPORTATION OF HEAVY TRANSFORMATORS FOR LITPOL AND NORDBALT PROJECTS
In 2015 Jūrtransa Ltd. participated in a project of delivery of heavy trafoes to Alytus and Kiskenai (Klaipedos district) for NORDBALT and LITPOL projects. In total 7 trafoes (110 tons weight) to Alytus and 4 trafoes (196 tons weight) for Kiskenai electrical...
TRANSPORTATION OF WIND POWER PLANT PARTS
During 2015 and 2016 year Jūrtransa Ltd. has arranged for permits and escorts, as well as partial delivery of more than 40 sets of wind turbine generators power plans to Mazeikiai and Silute district. The longest truck was 65 m length with the Rotorblades and heaviest...
KAUNAS (LT) – ROTTERDAM (NL)
KLAIPEDA (LT) – GRODNO (BY)
Photos from 2014
Various photos from 2014



