In spring 2017 “JURTRANSA” LTD fulfilled the order of “MT GROUP”, Lithuania, which constructed a storage facility for liquefied natural gas (LNG) in Klaipeda port. For this project “JURTRANSA” arranged for a delivery of 5...
Before Vilnius international airport started reconstruction works, main machinery and equipment was delivered to Kaunas airport. In three days we have made more than 30-ty cargo transportations. After month all cargo were delivered back to Vilnius in same short...
In 2017 summer has arranged for transportation of 6 heavylift and oversized cll from Klaipėda port to Belarus, Grodno fertilizer plant. Unit weight of each cll was from 45 up to 77 tons and the longest loaded vehicle had length of 45...
Jūrtransa Ltd. worked for almost a year to get prepared for a transport of a heavy equipment to Belorussia. The brand new equipment was successfully delivered to Grodno Azot plant. The biggest collo from the wholelist was a huge absorption tower (L – 50 m, W – 6,4 m,...
Heavy transformators (2 CLL) and equipment delivery from Klaipėda port to Belarus, Postavy electric station, total weight of all cargo is more than 455...